Five levels of convenient on-site parking.

Big things are happening at Bridge Studios. We have finalized construction on our new multi-level parkade which is situated in-between Stage 5/6/7/8.

Parkade Features:

  • 15 ft. high covered circus truck parking on level 1 with 2-400 amp camlocks
  • Washrooms
  • Direct access to stages 5/6/7/8
  • Levels 2 through 5 contain 4 electric car charging stations each (16 total)
  • 244 total parking spots
  • The ground floor is the first “covered” Base Camp / Circus parking area in British Columbia

Downloads:

 BRIDGE STUDIOS ARE PROUD PARTNERS OF